
Sawley (NG10)
Combined fuseboard + EV install on a 4-bed detached. 14-way full-RCBO + 7kW untethered charger fitted in a single day.
Commuter homes between Nottingham and Derby — heavy demand across NG10 for EV charger installs paired with fuseboard upgrades, plus routine EICRs and consumer unit work across Sandiacre and Sawley.
NG10 weekly coverage · 105-min response · EV install specialism
Long Eaton sits 12 miles south-west of Nottingham, on the Derbyshire border between Nottingham and Derby. It is one of the heavier EV-uptake postcodes in our coverage — a high proportion of NG10 households commute to either city, EV adoption sits above the regional average, and home charging is the default rather than the exception.
Housing is a mix of Victorian and Edwardian terraces along the older streets near the town centre, 1930s semis through Sandiacre, and post-war family estates through Sawley and the Trent-side fringes. Most properties have well-defined driveways or front-of-garage charger positions, which makes EV installs straightforward — typically 3–5 hour single-day jobs.
Long Eaton is also a frequent fuseboard-and-EV combined job. Pre-2008 consumer units on family homes don't meet 18th Edition and don't have spare ways for an EV charger circuit — so the two jobs land together. We quote them as a combined package and finish them inside a single working day where possible.
Sandiacre · Sawley · Long Eaton Centre · Trent Fields
Victorian and Edwardian terraces near Long Eaton centre; 1930s semis through Sandiacre; post-war family homes in Sawley and along the Trent-side; modern estate housing on the periphery.
Every service below is covered across NG10. Service-level pricing, timings and pricing on the dedicated service pages.
Full and partial rewires across Nottingham — safer circuits, modern sockets and a complete BS 7671 sign-off, with minimal disruption to your home.
See domestic rewire details18th Edition consumer unit upgrades with RCBO protection. Fitted, tested and certified by NICEIC approved electricians, usually inside a single day.
See fuseboard replacement detailsHome and workplace EV chargers. Tethered or untethered, neatly installed with load management and full electrical certification.
See ev charger installation detailsFixed-wire testing and Electrical Installation Condition Reports for shops, offices, warehouses and HMOs — issued with a clear remedial plan and pricing.
See commercial eicr detailsBS 5839 compliant fire alarm design, installation and servicing. Category L1 to L5 systems sized to your premises, your insurer and your fire risk assessment.
See commercial fire alarm system detailsDomestic and rental EICRs to MEES and Section 21 standards. Honest reporting, fair pricing and remedial work carried out by the same approved engineers.
See eicr / electrical safety certificate detailsCombined EV + fuseboard installs are our most-quoted Long Eaton job. We carry a pre-staged spec — 14-way full-RCBO consumer unit with a labelled EV-ready spare way, paired with a Hypervolt or Ohme 7kW charger — that lands on most NG10 commuter-belt homes. Combined price typically £200–£400 cheaper than splitting the jobs.
DNO liaison is included. Long Eaton sits on the same supply network as Nottingham city and the DNO process is identical — we handle the application end-to-end so the homeowner doesn't speak to National Grid Electricity Distribution directly unless they want to.
Pre-2008 consumer units across NG10 commuter-belt homes are now coded C2 and don't have spare ways for a new 32A EV circuit. The combined upgrade-and-charger job is by far the most common quote we issue here.
Voltage drop on long driveways is a Long Eaton-specific issue. Properties with 20m+ runs from the consumer unit position to the charger position need carefully sized cable to keep voltage drop inside BS 7671 limits — we routinely run 10mm² SWA on these jobs rather than the 6mm² that would be fine on a shorter run.
Sandiacre 1930s semi rewires are the third repeat finding. The original cabling has reached end-of-life on a substantial number of these properties — typically rubber-cored on the older streets, early PVC on the slightly later ones. Both need full replacement; neither can be salvaged with a fuseboard upgrade alone.
A representative sample of recent JBRC jobs across Long Eaton — every job directly supervised by Joshua Richardson and Benjamin Clurow.

Sawley (NG10)
Combined fuseboard + EV install on a 4-bed detached. 14-way full-RCBO + 7kW untethered charger fitted in a single day.

Sandiacre (NG10)
1990s plastic board → 12-way full-RCBO with SPD on a 3-bed semi. EICR upgraded from Unsatisfactory to Satisfactory same afternoon.

Long Eaton Centre (NG10)
10mm² SWA cable run across a 25m driveway to garage-mounted untethered charger. Voltage drop tested, well inside BS 7671 limits.

Sandiacre (NG10)
1930s semi full rewire with new EV-ready 14-way consumer unit. 6 working days, family in residence throughout.
The process we follow on a Long Eaton job is the same one we follow on every JBRC job. Service-specific detail lives on each service page.
Free site visit. We look at the job, confirm scope, and price in writing within 24 hours.
Agreed dates, agreed arrival window, agreed access. RAMS for commercial work.
NICEIC engineers, BS 7671 every time, every reading recorded, every cable identified.
EIC handed over the same day, NICEIC building control notification posted within 10 working days.
We cover NG10 as primary territory, plus surrounding areas via the corridor routes.
3 miles from JBRC base · Strong demand in West Bridgford for full rewires, EV charger installs and smart-home upgrades — particularly across Lady Bay and Edwalton.
4 miles from JBRC base · Domestic and small-commercial work close to the University of Nottingham.
10 miles from JBRC base · Cross-border into Derbyshire DE7 — older terraces often need full rewires and modern earthing upgrades, all signed off to BS 7671.
NICEIC certified install. 18th Edition consumer unit. Fitted in a day.